Friday, April 13, 2007

Tile Layout

I have to mount them on a board & frame it. Then the whole thing will be screwed to the wall.Grapes painted by the Greenturtle.Click on picture to enlarge.

Wednesday, April 11, 2007

Napkin Holder Dolphins Completed

Took the Dolphins out of the kiln this morning.Now I have the Tile in the kiln. Firing the glaze to an 06 cone. If all goes well they will be ready to install.

Tuesday, April 10, 2007

Paintig tile with Glaze

Dolphins trimmed with gold are in the kiln. Have to sit in the kiln overnight, lid closed, will open in morning. All the tile are coated with glaze & will go in the kiln tomorrow. Takes this many tile to make a 2ft. x 2ft. square.

Monday, April 09, 2007

Ready for the Gold

The Dolphins have been fired with glaze. Now I want to trim them with gold. That little 1/4 oz. botlle you see costs $ 15.00 but it does go a long way. Had it for two years. They will sit overnight, tomorrow I will fire the gold. Tricky to fire gold.

Firing With Gold


Sunday, April 08, 2007

Pouring Slip

Went to buy some glaze, only to find out my Ceramic shop was going out of business. They were getting rid of all there molds for free. Well Ethel found some fruit molds that she picked up. So here she is pourung slip into her fruit molds. Still need to buy some glaze.

Saturday, April 07, 2007

Coating with Glaze

The Dolphins are now Bisque & need 3 coats of Glaze. Then I will fire to an 06 cone. They need to be on pins when firing or they will stick to the shelves.

Thursday, April 05, 2007

Firing The Kiln



Dolphins & Harlieqen wall tile are being fired to bisque. The wall tile will be installed in the garage, back of the laundry sink.